Georgia Advanced Computing Resource Center: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 1: | Line 1: | ||
==Aug 22 outage== | ==Aug 22 outage== | ||
Soon: /etc/motd on pcluster, zcluster | |||
Sometime Tuesday: message to users | |||
2 PM: VM snapshots | |||
3 PM: | |||
disable logins pcluster | |||
disable logins zcluster (except for jkissing, students) | |||
kick users off pcluster | |||
kick users off zcluster? | |||
drain all nodes or queues, pcluster | |||
disable all queues except somedevq, zcluster | |||
kill all jobs pcluster | |||
kill all jobs zcluster | |||
do GE jobs testing MPI and storage I/O throughput | |||
stop execd on all nodes, zcluster | |||
W: shut down racks 8,9,10,11 | |||
4 PM: | |||
shut down VMs (but must have place to do storage shutdowns from) | |||
W: shut down 3070s | |||
W: shut down Panasas | |||
W: connect ESX IPMI cat5 | |||
W: "final rsyncs" of /db, /usr/local | |||
**** AFTER ****** | |||
CC configs NICs on storage for VLAN 20, maybe | |||
power up 3070s | |||
power up Panasas | |||
power up ESX servers and VMs | |||
power up racks 8,9,10,11 | |||
switch and test /db, /usr/local mounts on the zcluster | |||
do GE jobs testing MPI and storage I/O throughput | |||
W: GE upgrade | |||
W: yum updates of nodes | |||
W: yum update of zhead | |||
W: update FW on Dells | |||
W: reinstall rack11? | |||
switch and test NFS mounts on pcluster | |||
W: upgrade PGI compiler | |||
reenable queues on zcluster | |||
resume queues on pcluster | |||
enable logins pcluster | |||
enable logins zcluster | |||
==Clusters== | ==Clusters== | ||
===Overview=== | ===Overview=== |
Revision as of 10:49, 21 August 2012
Aug 22 outage
Soon: /etc/motd on pcluster, zcluster Sometime Tuesday: message to users 2 PM: VM snapshots 3 PM: disable logins pcluster disable logins zcluster (except for jkissing, students) kick users off pcluster kick users off zcluster? drain all nodes or queues, pcluster disable all queues except somedevq, zcluster kill all jobs pcluster kill all jobs zcluster do GE jobs testing MPI and storage I/O throughput stop execd on all nodes, zcluster W: shut down racks 8,9,10,11 4 PM: shut down VMs (but must have place to do storage shutdowns from) W: shut down 3070s W: shut down Panasas W: connect ESX IPMI cat5 W: "final rsyncs" of /db, /usr/local **** AFTER ****** CC configs NICs on storage for VLAN 20, maybe power up 3070s power up Panasas power up ESX servers and VMs power up racks 8,9,10,11 switch and test /db, /usr/local mounts on the zcluster do GE jobs testing MPI and storage I/O throughput W: GE upgrade W: yum updates of nodes W: yum update of zhead W: update FW on Dells W: reinstall rack11? switch and test NFS mounts on pcluster W: upgrade PGI compiler reenable queues on zcluster resume queues on pcluster enable logins pcluster enable logins zcluster